The New Colorado River Arch Bridge & BBR Post-Tensioning Technology – Preceded by ASG AGM

This presentation discussed the design development and project delivery process for the new signature bridge structure, and includes a summary of construction methods and final conditions for the new bridge.
David Goodyear (PE SE PEng) served TY Lin International as a Senior Vice President since 1996, and is currently Chief Bridge Engineer for North American Operations. David has been chief engineer for a variety of major bridge engineering projects including design of the Colorado River Bridge at Hoover Dam, the Crooked River Bridge in Oregon, and the new Port Mann Cable-Stayed Bridge in Vancouver, BC.